Onur Moroğlu
-
Referans-1 İstendiği taktirde paylaşabilirim
-
Görüntülenme 66
Eğitim
-
2011 - 2015
Karadeniz Teknik Üniversitesi
Lİsans
İnşaat Mühendisliği Bölümü
Deneyim
-
2022 - Devam
W-Scope Hungary Plant / Samsung Engineering
Site Chief
• 50.000 m³ (500 m³ perlite (vermiculite)) concrete casting cast in situ
• 20.000 m³ PC elements Installation
• 5.000 m² Formwork Installation
• 23.000 m³ Scaffolding Installation
• 10.000 m² Waterproof Application
• 60.000 m³ Excavation and Backfilling
• Sheet pilling Application
• Bored Pile Rebar-Concrete Work -
2021 - 2024
Akkuyu Nuclear Power Plant
Senior Construction Engineer
• 10.000 m³ Concrete Casting in Situ
• 5.000 tons Rebar Installation
• 10.000 m² Formwork Installation
I was responsible for the construction, follow-up and reporting of these
works in the field on the other hand I was also responsible for the handover
of the productions to the client. -
2019 - 2021
DAELIM-LIMAK-SK-YAPI MERKEZI JV
Construction Engineer
I worked as the site chief on the 1915 Canakkale Highway.
Besides the 1915Çanakkale Bridge , the project also includes the
construction of 2 concrete viaducts, 12 junctions (including those on the
state road), 12 bridges, 43 overpasses (including 1 ecological overpass), 40
underpasses, 235 culverts, 4 motorway service areas, 2 operation and
maintenance centers, 5 toll plazas.
You can see below my responsibilities in this project;
• Structural Works( Girder Underpass, Overpass, Portal Underpass )
• PC Production and Installation
• Drainage Works
• Secondary Works ( Guardrail, Handrail ve ITS, lighting )
Business or Sector Construction Department 1915 Çanakkale Bridge and
Highway Website https://www.1915canakkale.com/en-us/corporate/projectinformation