Onur Moroğlu

  • Referans-1  İstendiği taktirde paylaşabilirim
  • Görüntülenme 66

Eğitim

  • 2011 - 2015
    Karadeniz Teknik Üniversitesi

    Lİsans

    İnşaat Mühendisliği Bölümü

Deneyim

  • 2022 - Devam
    W-Scope Hungary Plant / Samsung Engineering

    Site Chief

    • 50.000 m³ (500 m³ perlite (vermiculite)) concrete casting cast in situ
    • 20.000 m³ PC elements Installation
    • 5.000 m² Formwork Installation
    • 23.000 m³ Scaffolding Installation
    • 10.000 m² Waterproof Application
    • 60.000 m³ Excavation and Backfilling
    • Sheet pilling Application
    • Bored Pile Rebar-Concrete Work

  • 2021 - 2024
    Akkuyu Nuclear Power Plant

    Senior Construction Engineer

    • 10.000 m³ Concrete Casting in Situ
    • 5.000 tons Rebar Installation
    • 10.000 m² Formwork Installation
    I was responsible for the construction, follow-up and reporting of these
    works in the field on the other hand I was also responsible for the handover
    of the productions to the client.

  • 2019 - 2021
    DAELIM-LIMAK-SK-YAPI MERKEZI JV

    Construction Engineer

    I worked as the site chief on the 1915 Canakkale Highway.
    Besides the 1915Çanakkale Bridge , the project also includes the
    construction of 2 concrete viaducts, 12 junctions (including those on the
    state road), 12 bridges, 43 overpasses (including 1 ecological overpass), 40
    underpasses, 235 culverts, 4 motorway service areas, 2 operation and
    maintenance centers, 5 toll plazas.
    You can see below my responsibilities in this project;
    • Structural Works( Girder Underpass, Overpass, Portal Underpass )
    • PC Production and Installation
    • Drainage Works
    • Secondary Works ( Guardrail, Handrail ve ITS, lighting )
    Business or Sector Construction Department 1915 Çanakkale Bridge and
    Highway Website https://www.1915canakkale.com/en-us/corporate/projectinformation

Diller

İngilizce
Yetkin